YearProject NameLineResponsibleClientStart DateFinish Date
2016Optimal integration of solar energy into the planning and operation of public urban railway transportation systems.4Carlos BenavidesComisión Nacional de Investigación Científica y Tecnológica, CONICYT
2016Disaster management and resilience in electric power systems.4Rodrigo MorenoResearch Council UK, CONICYT01/01/201601/01/2018
2016Direct use of geothermal energy for the promotion of sustainable production model in rural areas in Chile: Implementation of pilot projects in the wood drying and greenhouse for farming.4Marcelo Matus, Manuel DíazUNEP
2016Computational Platform to model and analyze Greenhouse Gases (GHG) mitigation actions implemented at the city, regional and national levels with medium- and long-term time scales.4Carlos BenavidesDepartment of Energy04/01/201611/01/2016
2016Optimal management of Liquefied Natural Gas (LNG) infrastructure and contracts in the Chilean energy system.4Sebastián PüschelComisión nacional de Energía04/01/201611/01/2016
2016Curricular consultancy on energy efficiency for higher education institutions.4Guillermo Jiménez, Manuel DíazAgencia chilena de eficiencia energética - AChEE01/26/201610/02/2016
2015Consultancy for the design of a national accounting structure for reduction/absorption of greenhouse gases and integration with existing measurement, reporting, and verification of mitigation actions systems.4Carlos BenavidesUNDP01/05/201606/10/2016
2015Programming tools for the operation of continual power systems based on Chebyshev pseudo-spectral representation.4Marcelo Matus, Rodrigo MorenoFONDEF01/01/201601/01/2018
2015Analysis tool for the spectral characterization of solar radiation in the Atacama Desert to improve the competitiveness of the solar industry in Chile.3, 4Marcelo Matus, Manuel Díaz01/01/201601/01/2018
2015Collaboration in the development of the Ameba software.4Rodrigo Moreno07/07/190507/08/1905
2015Analysis of the base price validity in the context of supply contracts.4Rodrigo PalmaChilectra07/07/190507/08/1905
2015Development of a clean and sustainable electric grid in Latin America - Phase II.3, 4Rodrigo PalmaInter-American Development Bank, IDB07/07/190507/08/1905
2015Development of a clean and sustainable electric grid in Latin America - Phase I.3, 4Rodrigo PalmaInter-American Development Bank, IDB07/08/190507/08/1905
2015Analysis of determining factors for hydroelectric development in the basins of Maule, Biobío, Toltén, Valdivia, Bueno, Yelcho, and Puelo, from generation potential to social-environmental dynamics.4Rodrigo MorenoDepartment of Energy08/01/201504/01|/2016
2015Development of short and long-term variable NCRE integration models.4Marcelo MatusColbún S.A.04/15/2016
2015Förderung der Solarenergie (schwerpunkt konzentrierende solartechnologien) – Promotion of solar energy (approach focused on solar technologies).4Claudia RahmannGerman Society for International Cooperation, GIZ06/17/201508/31/2015
2015Solar energy: A resource for sustainable development in the Atacama Desert.2, 3, 5Guillermo JiménezBHP Billiton Foundation01/12/2015
2015Scope of the SIC-SING interconnection project technical evaluation – Part Two.4Marcelo MatusGDF Suez
2015Professional services to create methodological and prospective inputs for the development of energy policies horizon 2050. Phase I.4Rodrigo MorenoSubsecretaría de Energía02/01/201509/01/2015
2015Study of compensation gear introduction to the Sistema Nacional de Transmisión del Ecuador.4Claudia RahmannCorporación eléctrica del Ecuador - CELEC
2014Development of a DeepEdit interface for case creation and display of results of the Power Electricity Tool (PET Model).4Frank LeañezInversiones e inmobiliaria y comercial Mega Prisma S.A.06/12/201404/12/2015
MAPS: Mitigation Action Plans and Scenarios.4, 5Rodrigo PalmaSouthSouthNorth Trust01/01/201503/31/2015
Study on the continuous improvement for the safe economical operation of the CDEC-SING.4Rodrigo MorenoCDEC-SING Ltda.
Zonification of the Chilean Electricity System for a safe and economical supply.4Rodrigo MorenoCDEC-SING Ltda.
2015R & D collaboration in the development directed by Enel Green Power. Ollagüe, Chile.2Guillermo Jiménez, Patricio MendozaEnel Green Power
2015Competitiveness Formation Program – PFC (for its Spanish acronym), International School: Theoretical foundations of solar energy.3Marcelo MatusCorporación de desarrollo social del sector rural - CODESSER08/10/201508/21/2015
2015Electricity system long-term economical operation model.4Marcelo MatusColbún S.A.
2014Geographical study of NCRE technology energy generation potential and demand model.4Guillermo JiménezCorporación regional de desarrollo productivo de Coquimbo (CRDP)03/17/201403/17/2016
2014Development of a solution for the connection of the PLP with PLEXOS software in order to obtain time simulations throughout the long-term study.4Marcelo MatusE.CL S.A.
2014Development proposal for a solar energy cluster in the region of Atacama.3Rodrigo PalmaDivisión de prospectiva y política energética. Department of Energy
2014Renewable energy smart microgrids as enablers of productive and tourism potential in isolated communities and promotion of new low-cost, high-replicability technological solutions, case El Romeral.2Guillermo JiménezFundación Chile
2014Solar energy for electricity and heat generation.3Guillermo JiménezGerman Society for International Cooperation, GIZ
2014Experience analysis and diagnosis of grid-connected and operating solar plants in Chile.3Rodrigo PalmaGerman Society for International Cooperation, GIZ07/14/201410/27/2014
2014Interconnection of SIC and SIG systems technical evaluation, considering growth projections and development of these systems in areas involving use and generation in the regions of Antofagasta and Atacama.4Marcelo MatusTransmisora Eléctrica del Norte S.A., TEN08/01/201410/30/2014
2014Complementation of the geographical study of NCRE technology energy generation potential and demand model in the region of Coquimbo.2 y 5Guillermo JiménezSubsecretaría de Energía11/12/201403/12/2015
2014Baseline for the development of energy policies for the region of Aysén Carlos Ibáñez del Campo.4, 5Guillermo JiménezDepartment of Energy
2014Energy proposal for Easter Island.2, 5Guillermo JiménezDepartment of Energy
2014Promotion of solar energy (focused on solar concentration technologies).4Guillermo JiménezGerman Society for International Cooperation, GIZ11/01/201408/03/2015
2014Development of an Energy Efficiency Law proposal and respective regulations.4Guillermo JiménezSubsecretaría de Energía
2014Solar energy for electricity and heat generation.3Guillermo JiménezGerman Society for International Cooperation, GIZ11/30/2014
2013Improvements to the long-term programming (PLP for its Spanish acronym) operation model – Parallelization of the program code.4Marcelo MatusCDEC-SIC
2013Databases and case studies of the SIC-SING system through to 2025 on PLP.4Marcelo MatusE.CL S.A.
2013Solar energy for electricity and heat generation.3Rodrigo PalmaGerman Society for International Cooperation, GIZ10/21/201312/31/2013
2013Business model for Valhalla Spa.4Marcelo MatusEnergía Valhalla Spa
2014Technical consultancy on the development of a work plan for the interconnected systems of central and northern Chile under Colbún’s requirements based on the information provided by the National Energy Committee.4Marcelo MatusColbún S.A.
2014Technical-economical proposal on regulatory and rating schemes applicable to fuel contracts of generation plants.4Marcelo MatusCorporación Nacional del Cobre, CODELCO
2014Energy scenarios platform – Chile 2030.4Marcelo Matus, Carlos ToroFundación Chile10/27/201401/30/2015
2014Improvements to the PLP operation model – Use of various optimization engines via OSI.4Marcelo MatusCDEC-SIC
2014Electricity supply economic analysis of generators with GNL fuel supply take-or-pay contract.4Marcelo MatusComisión nacional de Energía
2014Improvements to the PLP operation model – BigPLP, dynamic allocation, reduction and memory optimization.4Marcelo MatusCDEC-SIC
2014Stage - STE. Scientific and technological alliance for guaranteeing the European excellence in concentrating solar thermal energy.3Rodrigo PalmaCentro de investigaciones energéticas, medioambientales y tecnológicas, Ciemat
2014Solar energy for electricity and heat generation.4Rodrigo Palma , Guillermo JiménezGerman Society for International Cooperation, GIZ11/15/201412/06/2014
2014Consultancy on maintenance and operation of Huatacondo’s hybrid system.2, 5Guillermo JiménezCompañía Minera Doña Inés de Collahuasi SCM
2014Cooperation in participative electricity tender processes.4Rodrigo Palma
2014MAPS: Cooperation agreement between universities.4, 5Marcelo Matus
2014Consultancy during meetings with the National Energy Committee to study tender reforms and support the modeling area.4Rodrigo MorenoSystep Ingeniería
2014WAMS Seminar.2Rodrigo PalmaCDEC-SIC
2013Technical-economic consultancy: Analysis of the CMDIC transmission system.4Marcelo MatusCompañía Minera Doña Inés de Collahuasi SCM
2013Sustainable microgrid for energy community services (Puertecitos, Ensenada, Baja California).2Guillermo JiménezUniversidad Autónoma de Baja California (UABC) / Comisión Estatal de Energía de Baja California (CEEBC)
2013Updating of old irrigation agreements in the new PLP model.4Marcelo MatusCDEC-SIC
2013DeepEdit SPS tools.4Rodrigo Palma, Frank LeañezConecta S.A.
2013Optimization of wind turbines.1Ignacio PolancoPiemonte
2013Wind unit Support (Wind unit in Melado).
2013Understanding innovation and energy processes.1Rodrigo PalmaAcademia Chilena de Ciencias07/15/2013
2013Retrospective analysis of the NCRE contributions in 2012.4Rodrigo PalmaACERA
2013Development of electric analysis tools for Energía Andina projects.4Rodrigo PalmaEnergía Andina S.A.
2013Electricity sector regulations and operations workshop in the implementation of smart grid-type solutions.2Guillermo JiménezEntel S.A.
2013Expansion strategy for renewable energy in the interconnected electricity systems.4Rigoberto TorresGerman Society for International Cooperation, GIZ02/15/201309/30/2013
2013Design of incentive mechanisms to promote electricity generation projects at distribution level.4Rodrigo PalmaDepartment of Energy / Coejecutores: Valgesta Energía S.A. , Quantum
2013MAPS: Mitigation Action Plans and Scenarios.4, 5Marcelo MatusSouthSouthNorth Trust01/01/201312/31/2013
2013Improvements to the PLP operation model – Representation of line maintenance.4Marcelo MatusCDEC-SIC
2013Consultancy on maintenance and operation of Huatacondo’s hybrid system.2, 5Guillermo JiménezCompañía Minera Doña Inés de Collahuasi SCM
2012Lithium Innovation Center1Jaime AléeSociedad Química y Minera de Chile S.A., SQM / Sociedad Chilena de Litio Ltda., Chemetall / Marubeni Holding Limitada, Marubeni
2012Detail engineering of electricity supply solutions for Ollagüe.2Guillermo JiménezEnel Latin American (Chile) Ltda.05/28/201201/031/2013
2012Detail engineering study project for hybrid electricity generation in Ollagüe.2Guillermo JiménezCorporación Nacional del Cobre, Codelco (División Chuquicamata)
MAPS.4, 5Marcelo Matus04/15/201204/14/2014
2012MAPS: Mitigation Action Plans and Scenarios.4, 5Marcelo MatusSouthSouthNorth Projects (Africa)
2012Evaluation of the current situation and definition of a pilot Smart Grid project in the region of Magallanes y Antártica Chilena.2, 5Guillermo JiménezSubsecretaría de Energía11/30/2012
2012Study of tolls for SIC-SING interconnection scenarios.4Rodrigo PalmaGasAtacama Chile S.A.
2012Expansion strategy for renewable energy in the interconnected electricity systems.4Rigoberto TorresGerman Society for International Cooperation, GIZ09/01/201208/15/2013
2012Stability and convergence improvements for PLP program.4Marcelo MatusCDEC-SIC
2012Demand blocks modeling improvements for PLP program.4Marcelo MatusCDEC-SIC
2012Irrigation agreements and reservoir management modeling improvements for PLP program.4Marcelo MatusCDEC-SIC
2012Study on fuel-related transportation subsidies.4Marcelo MatusDistribuidora Automotriz Marubeni Ltda.
2012Feasibility of Timaukel microgrid, Villa Cameron.2Centro de Energías Renovables, CER, CORFO
2012Mapping of potential microgrids in Chile.2Centro de Energías Renovables, CER, CORFO
2012ERNC developer/investor workshops.1, 4, 5Centro de Energías Renovables, CER, CORFO
2012Roadmaps for technological development in Chile.1, 3, 4Centro de Energías Renovables, CER, CORFO
2012Development of NCRE projects potential calculator.1, 3, 4Centro de Energías Renovables, CER, CORFO
2012Development of standard profiles for NCRE power supply systems.2Centro de Energías Renovables, CER, CORFO
2012Connection guide for NCRE isolated projects.1, 2Centro de Energías Renovables, CER, CORFO
2012Photovoltaic electrification of the town school in El Romeral.2Suez Energy Andino S.A., SEA04/30/201206/28/2012
2012MAPS: Mitigation Action Plans and Scenarios.4, 5PricewaterhouseCoopers05/22/201204/22/2013
2012Indirect energy consumption for electric traction rating model.1Rigoberto TorresEmpresa de los Ferrocarriles del Estado, EFE03/02/201207/29/2012
2012Feasibility study for incorporation of NCRE into the national electricity systems.4Rigoberto TorresAsociación chilena de energías renovables A.G., ACERA
2012Fuel information system.4Marcelo MatusSuperintendencia de electricidad y combustibles01/06/201208/28/2012
2012Research on the modeling of greenhouse gas emissions and energy consumption projection scenarios for the evaluation horizon 2007-2050.4Marcelo MatusPricewaterhouseCoopers Services Limited
2012Toll studies for SIC-SING interconnection scenarios.4Marcelo MatusFundación Chile - Escenarios Energéticos
2012Evaluation seminar on electric and hybrid buses in Santiago.1Sociedad consultora Sistemas Sustentables
2012Technical consultancy for electric vehicles in energy efficiency measurements and training courses for professionals (Brazil).1Sociedad consultora Sistemas Sustentables
2012Consultancy on Klein Volskwagen conversion.1Cervecería Kunstmann Ltda.
2012Consultancy on maintenance and operation of Huatacondo’s hybrid system.2, 5Compañía Minera Doña Inés de Collahuasi SCM
2011Development of control strategies, generation units comprehensive models, and integrated simulator for microgrids applied to rural energization.2, 5Guillermo JiménezCompañía Minera Doña Inés de Collahuasi SCM12/01/201112/01/2012
2011Atacama Solar Challenge.3Rodrigo PalmaSubsecretaría del medio ambiente12/30/2011
2011Development of technical specifications for the improvement of the electric power plant and implementation of an emergency microgrid in the town of San Juan Bautista, Juan Fernández Archipelago.2Guillermo JiménezSubsecretaría de Energía04/28/2012
2011Consultancy on heat supply tender for EW process through solar energy.3Rodrigo PalmaMinera Gaby Spa
Technical bases for PARSE computerized implementation.4Marcelo MatusFundación para la Transferencia Tecnológica
2011Smart hydraulic plant.1, 3Comisión Nacional de Investigación Científica y Tecnológica, CONICYT11/30/2012
2011Applied research for NCRE technologies development.4Guillermo JiménezSubsecretaría de Energía09/14/2012
2011Applied research on regulations and modeling with non-conventional renewable energy.4Marcelo MatusSubsecretaría de Energía
2011Impact quantification on SING supply efficiency and safety attributes for diverse NCRE scenarios.4Marcelo MatusGerman Society for International Cooperation, GIZ12/01/201108/24/2012
2011NCRE – Photovoltaic plant in San Pedro de Atacama.1, 2German Society for International Cooperation, GIZ11/20/201101/31/2012
2011Additional setback line from SING to usage in the region of Atacama.4Rodrigo PalmaGasAtacama Chile S.A.05/18/201106/22/2011
2011Parallelization of the PLP program.4Marcelo MatusColbún S.A.
2011Expansion strategy for renewable energy in the interconnected electricity systems – Dynamic study of the expansion of non-conventional renewable energy (NCRE) in Norte Grande’s Central Interconnected System (SING).4Claudia RahmannGerman Society for International Cooperation, GIZ11/04/201110/12/2012
2011Expansion strategy for renewable energy in the interconnected electricity systems – Additional scenarios for the “Impact quantification in SING supply efficiency and safety attributes in the SING for diverse NCRE scenarios” study.4Claudia RahmannGerman Society for International Cooperation, GIZ10/24/201111/14/2011
2011Development of applied research on energy subjects.4Marcelo MatusSubsecretaría de Energía
2011Additional setback line from the SING to usage in the region of Atacama.4Marcelo MatusGasAtacama Chile S.A.09/07/2011
2011Implementation of DEEPEDIT platform for expert panel of Law 19,940.4Rodrigo PalmaSubsecretaría de Energía08/31/2011
2010Impact study on the SIC for contingencies in HidroAysén HVDC system.4Rodrigo Palma, Guillermo JiménezCentrales hidroeléctricas de Aysén S.A. - HidroAysén11/24/201003/24/2011
2011Heat supply through solar energy.3Rodrigo PalmaMinera Gaby S.A.02/01/201104/30/2011
2011Expansion strategy for renewable energy in the4Rigoberto TorresGerman Society for International Cooperation, GIZ04/13/201107/29/2011
interconnected electricity systems – Evaluation of the
impact of various NCRE expansion scenarios in Norte
Grande’s Central Interconnected System (SING) under
supply safety and economic efficiency criteria.
2011Cadastre, analysis, and projection of unused hydroelectric micro-plants in southern Chile. (Under the study “MDL Promotion entity to improve competitiveness and sustainable development of national companies.2Guillermo JiménezFundación para la Transferencia Tecnológica - UNTEC03/31/201107/29/2011
2010Design of an economic model to analyze fusions in the electricity industry.4Rodrigo PalmaQuantum Andes SAC
2010Development of simulation models and tools for an initial technical evaluation of the dynamic monitoring system of the circuit Nogales-Pan de Azúcar 220 kV to allow subsequent codification and implementation on a computerized platform for online monitoring.4Rodrigo PalmaTranselec S.A.09/30/201011/29/2010
2010Expansion strategy for renewable energy in the interconnected electricity systems – Proposal of a strategy that allows analyzing input of new NCRE capacities into the Chilean generation industry in the mid and long-term.4Rigoberto TorresGerman Technical Cooperation Agency, GTZ09/01/201011/30/2010
2010DO procedure improvement for the programming of CDEC-SING operations.4Rodrigo PalmaCDEC-SING Ltda.
2010Rating process for subtransmission systems, namely the SIC-2 system.4Rodrigo PalmaChilquinta Energía S.A.05/15/201006/15/2010
2010Study of comparative economic impact caused by the reconfiguration of local transmission tolls.4Rodrigo PalmaCompañía Minera Doña Inés de Collahuasi SCM05/03/201006/04/2010
2010Non-conventional renewable energy.4Rigoberto TorresGerman Technical Cooperation Agency, GTZ03/29/201009/15/2010
2010Economic assessment of Colbún 220 kV-Ancoa 220 kV interconnection.4Rodrigo PalmaColbún S.A.
2010Implementation of pilot Project – Phase II.2Guillermo JiménezCompañía Minera Doña Inés de Collahuasi SCM04/01/201010/31/2010
2009Development of renewable energy-base hybrid system – Application on mining towns in Norte Grande – Phase I.2Guillermo JiménezCompañía Minera Doña Inés de Collahuasi SCM12/04/200903/31/2010
2009Renewable energy – Electric demand projection study on San Pedro de Atacama’s Electricity system (CESPA).2Guillermo JiménezGerman Technical Cooperation Agency, GTZ07/03/200909/25/2009
2009Diagnosis of generation planning models for the national electricity industry.4Rodrigo PalmaComisión nacional de Energía10/30/2009